MODEL: SR4POST
5
ADJUSTABLE OPEN RACK
6
Assembly Instructions
7
Contents
1 -Base ((2 Pcs.)
2 -Post ((4 Pcs.)
3 -Side llower meembers ((4 Pcs.)
4 -Centeer lowerr mmembers ((2 Pcs.)
5 -Side uupper meembers ((4 Pcs.)
2
6 -Centeer upperr mmembers ((2 Pcs.)
7- Top ssupport bbrackett ((2 Pcs.)
Assembly hardware
3
3/8¨-116 UNF heex nut (332 Pcs.)
3/8¨X 7/88¨ Springg washer ((32 Pcs.)
3/8¨-116x1¨UNFF screw ((332 Pcs.)
* Equipment Hardware
4
12-24 X 5/8”Cilindrycal head screw (56 Pcs.)
PVC black flat washer (56 Pcs.)
12-24X5/8” Conical screw washer (56 Pcs.)
PVC White flat washer (56 Pcs.)
12-24 x 5/8 Screw (56 Pcs.)
Required Tools
1
9/16¨ WWrench
9/16¨¨ Sockkeet, Rattchet
Cable manager hooks...
(32 Pcs w/mounting fasteners)
Install Pre-Assembled upper
side members as shown
Assemble Base & Posts
1
4
*Use included nuts .Fasten tightly
* Place base on a hard flat surface. Use 3/8¨
Screws to attach base to each post
1A. repeat for rear side
Install Pre-Assembled lower side
members as shown
* Verify alignment before tightening
5
Assemble top support bracket
* Verify alignment
2
2A. repeat for rear side
Install Cable Manager Hooks as desired
* Use included plastic fasteners
Pre-Assemble upper and lower
side memebers
* Set desired depth
6
3
Use 3/8¨Screws and tighten members
4
2
4
2
1111 W. 35th St, Chicago, IL 60609
|